Intermodal image

Projects

Delivering services to complete environmental audits for the Goulburn-Murray Water Connections Project.

Delivering detailed remediation, geotechnical and occupational hygiene consultancy to support the Sydney Modern Oil Tank Gallery project.

Tetra Tech Coffey provided detailed geotechnical consultancy to support the Wai Ariki Hot Springs and Spa project.

Tetra Tech Coffey is providing services in support of the delineation, controlled demolition, and remediation of the Tottenham site.

Delivering environmental services to support the design and construction of the North West program for the Level Crossing Removal Project.

The Victorian Murray Floodplain Restoration Project (VMFRP) will get much needed water back onto nine high-value floodplains along the Murray River.

Helping future-proof Melbourne’s rail infrastructure and construction of the elevated rail solution.

Tetra Tech Coffey is the lead environmental consultant for preparing and submitting the Integrated Impact Assessment Statement for Basslink

Delivering geotechnical investigations, detailed design, and construction phase services for the Waikato Expressway.

Providing detailed geotechnical site investigation and temporary works design, together with groundwater, contamination, and occupational hygiene services for Sydney Gateway

The Middle School redevelopment is the cornerstone of Carey’s comprehensive Masterplan, delivering leading edge pedagogy with modern, flexible learning spaces.

Delivering environmental, land use planning, and heritage advisory services to support Project Marinus since 2018

Providing detailed geotechnical and hydrogeological investigation, design and advice to support the design and construction of the Metro Tunnel project’s tunnels and stations

Leading with geotechnical services to help guide the expansion and development of the largest port in the South Island in New Zealand

Supporting integrated land use and infrastructure planning at Circular Quay

Tetra Tech Coffey worked closely with our client and local stakeholders to revitalise an inner city warehouse into a modern facility.

Engaged by the Mornington Peninsula Shire Council, Tetra Tech Coffey provided project management services throughout the design and construction of this state-of-the-art aquatic centre.

Tetra Tech Coffey has been contracted to provide project management services for the development of the new Wyndham City Council Football Training Facilities. 

Tetra Tech Coffey will be Engineer to the contract and deliver project management services across the three-year Ōtāhuhu College upgrade project for the Ministry of Education.

Tetra tech Coffey are working closely with Project Marinus to transform energy supply to Victoria and Tasmania

Tetra Tech Coffey undertook a desktop environmental assessment review of social and community development initiatives in various Pacific Island countries.

Rebuilding a community after the devastating impacts of the Canterbury earthquakes in New Zealand

Assisting NSW Health Infrastructure to successfully deliver its $40 million upgrade project at Manning Hospital

Supporting the deployment of 72 new Joint Strike Fighter F-35A aircraft for the Australian Department of Defence

Providing design and engineering support for a purpose built, shared facility that will support efficient and effective off aircraft maintenance for F-35A Joint Strike Fighter aircraft at the RAAF Base Williamtown

Helping future-proof Sydney’s key freight and rail infrastructure and expand the South Sydney Freight line

Providing a geotechnical risk assessment of the cliffs surrounding the Cockatoo Island plateau, part of essential works to manage risks

Applying a risk-based approach to identify, assess, and help remediate soil and groundwater contamination at Geraldton Port

Delivering extensive geotechnical investigation services to help Sunwater deliver on this much needed resource capture

Delivering geotechnical investigations, detailed design, and construction oversight for the Sapphire to Woolgoolga Pacific Highway upgrade project

Providing vital geotechnical and contamination investigations for the design of the Western Harbour Tunnel alignment 

Delivering geotechnical and hydrogeological services to support upgrades to the Melbourne Metro Tunnel

Delivering high quality geotechnical, geophysical, and environmental investigation services for the design and construction of new wharves within an operational vital base for the Royal Australian Navy

Supporting our client with environmental expertise in Port Kembla to future-proof one of Australia’s largest vehicle import facilities

Delivering project management services to support upgrades to the campus and facilities at St Leonard’s College, East Brighton Campus

Providing project management services to support the development of a new sustainability and environmental centre at St Columba Anglican School

Providing project management services to support the development of a new aquatic centre, the flagship project of the Victoria’s State Government’s Latrobe Valley Sports and Community Initiative

Providing environmental consultancy services to support the redevelopment of the former Sydney Entertainment Centre and its associated car park in Darling Harbour Sydney, Australia

Delivering project management services to support design upgrades to facilities at AFLW Victoria Park

Supporting infrastructure and construction oversight for a new 1000-student public school and its surrounding area in New South Wales

Providing energy consulting, GIS services, and project management to support a complex natural gas project in Papua New Guinea

Delivering geospatial, spatial research, and data visualisation to support the development of a 13,600 hectare wind farm in Western Victoria

Employing our Leading with Science® approach to deliver the geotechnical investigation for AGL’s Gas Import Jetty Project

Delivering a wide range of site geotechnical services and intelligent value engineering to overcome challenging ground conditions at a solar farm in Victoria

Providing energy design standards and technical advice for development of our client’s first solar farm in Australia

Leading the geotechnical and hydrological services for one of the largest wind farms in the southern hemisphere

Providing geotechnical and design advisory services to deliver a 770 metre long perimeter diaphragm wall for the basement at Barangaroo South

Providing occupational hygiene services for the construction of the 100 kilometre railway line between Marandoo and Yandi in the Pilbara area of Western Australia

Delivering structural engineering and modelling services to safely demolish an IMAX theatre

Providing environmental management and consultancy services of a mine in Papua New Guinea to support government decision-making 

Tetra Tech Coffey delivered specialist solutions to meet the significant challenges of road construction on a floodplain and soft soils.

Supporting investigation works for Stage 2 of Parramatta Light Rail project in Parramatta, Australia

Delivering asbestos risk assessment and hygiene monitoring for a critical utility tunnel project

Providing remediation, hygiene, and environmental management services to support a new 5000-square metre park in Rosebery, Sydney

Bringing geotechnical and structural engineering expertise to assist in constructing Moore Park Tunnel for Sydney Light Rail

Bringing specialist geotechnical expertise to the Kaikōura Earthquake Recovery project

Want to get in touch?